INTEGRATION & INSTALLATION

A great design
still has to
get built right.

The gap between a clean spec and a system people trust is the install. We close it — infrastructure, integration, and commissioning done so the room works on day one and keeps working.

Get in touch
Installation Systems Integration Cabling & Infrastructure Programming Commissioning Testing & Handoff Installation Systems Integration Cabling & Infrastructure Programming Commissioning Testing & Handoff

A perfect design fails on a sloppy install. The unlabeled rack, the half-finished integration, the scene nobody tested — that's where projects quietly break. We treat the install as the part that actually has to work — built clean, integrated for real, and proven before we hand you the keys.

Three parts,
one working room.

01 — INSTALLATION

Infrastructure &
Installation

The bones of the system go in first. We put in cabling, racks, and devices the way you'd want to find them a year later — clean, labeled, and built to be serviced, not just to pass inspection.

  • Structured cabling & containment
  • Rack & panel build-out
  • Fixture & device install
02 — INTEGRATION

Systems
Integration

Lighting, AV, shades, and building systems should behave like one system, not five that happen to share a room. We tie them together so the room responds the way people expect it to.

  • Lighting, AV & shade control
  • Building-system interfaces
  • One coherent control layer
03 — COMMISSIONING

Commissioning
& Handoff

Installed isn't the same as working. We program the scenes, test every state, tune it with you, and train the people who run it — then leave documentation that matches what's actually on the wall.

  • Programming & scene design
  • Full-system testing
  • Training & documentation

The job is in
the details.

Any crew can make a system turn on for the walkthrough. The difference shows up later — the first time something changes, breaks, or has to be handed to someone new. We build for that day, not the demo.

THE RACK

Is every cable labeled, dressed, and traceable a year from now?

THE SCENES

Has every lighting state been tested — not just the look in the photos?

THE EDGE CASES

What happens the night one device drops off the network?

THE HANDOFF

Can the operator run the room without calling us first?

From drawings
to a live room.

01

Confirm it's ready

Before crews mobilize, we check that the space, the infrastructure, and the spec actually line up. Catching the gaps now is far cheaper than catching them mid-install.

02

Install & integrate

Cabling, hardware, and integration go in clean — labeled, documented, and tied together so the systems behave as one. Built to be lived in and serviced, not just switched on.

03

Commission & hand off

We test every state, tune it alongside you, train your team, and leave documentation you'll actually open. You get a room that works — and the confidence to run it.

Two ways to
build a system.

THE TYPICAL WAY

Install and
walk away

  • Cabling rushed in and rarely labeled
  • Integration left half-finished between trades
  • Only the demo scene ever gets tested
  • Documentation is a folder nobody updates
  • The operator learns the system on their own

THE iLX WAY

Build it to
be lived in

  • Every cable labeled, dressed, and traceable
  • Systems integrated into one coherent layer
  • Every state tested before we leave site
  • Documentation that matches what's installed
  • Your team trained to run it with confidence

READY WHEN YOU ARE

Let's build it
right the first time.

Get in touch